|
PAGE TWO

Don starts the body shaping on his Pulmax

On to the wheeling machine to add more shape

Tail section is starting to take shape

Side view of tail section

Here are three shots of the Scorpion dragster body as
of Tuesday 4-20-04. It is all attached with Dzus fasteners . all the lap joints
have a 3" strip of .060 aluminum riveted every inch with flush rivets .
These will be sanded off smooth and painted over with black paint.


Updates 5-10-94

Here are two shots of all the body panels at the
painters shop Craig Huls of Wylie TX. While he is doing his part we will be
rebuilding the rear end ,building the engine and working out fuel and oil
systems. that attach to the chassis. We are also putting a battery in the car
to make it able to self start.
Something over 30 days to go to
get it to Bowling Green and lots to do yet . No mater what stage it is in it
will be at B.G.
Thanks Don Ross


The rolling chassis June 2004

The Hemi is in and about ready to fire

The body is painted and ready for the pin-stripper

Lettered and striped June 2004

This great recreation will make it's debut at the NHRR June
18-20, 2004
|